Close Menu
    What's Hot

    Dubai Delhi AI4306 delay exposes Air India crisis management

    August 4, 2026

    As of August 2, 2026, EU Implements AI Content Labeling Regulations Across Member States

    August 4, 2026

    UK Economy Shows Resilience in Early 2024 Despite Inflation and Labour Market Challenges

    August 4, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Dubai Delhi AI4306 delay exposes Air India crisis management
    • As of August 2, 2026, EU Implements AI Content Labeling Regulations Across Member States
    • UK Economy Shows Resilience in Early 2024 Despite Inflation and Labour Market Challenges
    • On March 13, Eastern Washington Wildfires Result in 67,000 Evacuations
    • Stocks Surge on Wall Street as Dow Hits New High and Oil Prices Fall in Early August
    • Michigan Confirms Two Cyclospora-Related Deaths in Latest Outbreak Update as of August 2026
    • Boao Forum: CRRC Zhuzhou Institute Outlines Core Technologies and Application-Driven Innovation for Green Industry Growth
    • Coming to America: Africa Business Investment Summit Brings $4 Billion Pipeline to Washington as Investors Seek Growth Beyond Traditional Markets
    • Home
    • Contact Us
    Giza Mail: Egypt’s news, delivered with context.Giza Mail: Egypt’s news, delivered with context.
    Wednesday, August 5
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • More
      • Sports
      • Technology
      • Travel
    Giza Mail: Egypt’s news, delivered with context.Giza Mail: Egypt’s news, delivered with context.
    Home»PR Newswire
    PR Newswire

    Huawei Digital Power’s C&I GFM ESS Passes Extreme Ignition Test

    December 16, 2025

    SHENZHEN, China, Dec. 16, 2025 /PRNewswire/ — Huawei Digital Power’s Commercial and Industrial Hybrid Cooling Grid Forming Energy Storage System (C&I GFM ESS) has successfully passed a stringent extreme ignition test witnessed by TÜV Rheinland. Conducted at a national key fire safety lab, the test is the industry’s first fire assessment of an ESS in compliance with the latest UL 9540A:2025 standard.

    Huawei Digital Power's C&I GFM ESS Passes Extreme Ignition Test

    Extreme Challenge: Rigorous Test Environment

    The test was designed to create the industry’s most demanding verification environment, evaluating the safety performance of ESSs under extreme ignition scenarios. A pack-level overcharge method was used to trigger simultaneous thermal runaway in 60 battery cells. Compared with tests involving only single or a few cells, the severity of this assessment increases exponentially.

    Further rigor was ensured through the following conditions:

    1. The open-door ignition test method specified in UL 9540A:2025 is employed to maximize oxygen availability.
    2. All packs are fully charged to 100% SOC.
    3. All proactive and passive fire suppression systems are disabled during testing, requiring the ESSs to rely solely on their intrinsic design to withstand combustion at full energy capacity.

    Proven Strength: Five-Level Protection System

    Under these extreme conditions, Huawei’s C&I GFM ESS demonstrated outstanding safety performance, supported by its innovative five-level protection design.

    1. Inter-cell thermal isolation: It effectively slows down the thermal runaway propagation between cells, providing the first defense for system safety.
    2. All-metal pack enclosure: The enclosure can withstand temperatures higher than 1500°C, maintaining structural integrity even under intense fire to minimize damage.
    3. Positive-pressure oxygen blocking and directional smoke exhaust: This innovative design redirects combustibles, significantly reducing fire impact.
    4. Fireproof labyrinth design: All ESS sealing surfaces feature a labyrinth structure to effectively prevent flame spread.
    5. Enhanced container fire resistance: The container is armored to provide comprehensive fire protection.

    Data Evidence: Key Indicators Demonstrating Excellent Performance

    Test data robustly validates the safety and reliability of Huawei’s C&I GFM ESS. When the fire temperature reached 961°C, the highest cell temperature of an adjacent ESS was only 45.3°C, well below the threshold for opening the cell explosion-proof valve. The system fully complied with UL 9540A:2025 requirements, with no fire propagation between units.

    The recorded peak heat release rate (HRR) was 3 MW. Total combustion lasted less than three hours before self-extinguishing. Under open-door burning conditions, the system rapidly managed heat release, demonstrating superior thermal management capability.

    Photo – https://mma.prnewswire.com/media/2846494/Huawei_Digital_Power_s_C_I_GFM_ESS_Passes_Extreme_Ignition_Test.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/huawei-digital-powers-ci-gfm-ess-passes-extreme-ignition-test-302643305.html

    Keep Reading

    Boao Forum: CRRC Zhuzhou Institute Outlines Core Technologies and Application-Driven Innovation for Green Industry Growth

    Coming to America: Africa Business Investment Summit Brings $4 Billion Pipeline to Washington as Investors Seek Growth Beyond Traditional Markets

    UGREEN Unveils Nexode & MagFlow Air Editions: Super Compact Power to Go

    Tencent Cloud and tapmad Partner to Deliver Seamless Streaming for a Global Football Tournament in Pakistan

    Goldwind-powered Ummbila Emoyeni Wind Farm Phase One Enters Commercial Operation, Marking a Milestone in South Africa’s Just Energy Transition

    KONE Egypt strengthens customer experience through digital innovation

    Latest News

    As of August 2, 2026, EU Implements AI Content Labeling Regulations Across Member States

    August 4, 2026

    UK Economy Shows Resilience in Early 2024 Despite Inflation and Labour Market Challenges

    August 4, 2026

    On March 13, Eastern Washington Wildfires Result in 67,000 Evacuations

    August 4, 2026

    Stocks Surge on Wall Street as Dow Hits New High and Oil Prices Fall in Early August

    August 4, 2026

    Michigan Confirms Two Cyclospora-Related Deaths in Latest Outbreak Update as of August 2026

    August 4, 2026

    By June 2026, UK solar capacity hits 22.8 GW ahead of upcoming plug-in solar regulations

    August 3, 2026

    July Sees Record-Breaking Heat in Austria, Contributing to €1.4 Billion in Economic Losses

    August 3, 2026

    On April 27, 2024, Trump Moves to Halt Iran Strikes Amid Rapid Nuclear Negotiations

    August 3, 2026
    © 2026 Giza Mail | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.