Close Menu
    What's Hot

    Envision and Sasol Advance Future Energy Systems with Green Hydrogen Collaboration in South Africa

    August 5, 2026

    July sees Eurozone manufacturing output reach highest level in 52 months despite sluggish demand

    August 5, 2026

    Skye Africa Intelligence and ECSA-HC Sign Memorandum of Understanding to Scale AI-Enabled Health Solutions

    August 5, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Envision and Sasol Advance Future Energy Systems with Green Hydrogen Collaboration in South Africa
    • July sees Eurozone manufacturing output reach highest level in 52 months despite sluggish demand
    • Skye Africa Intelligence and ECSA-HC Sign Memorandum of Understanding to Scale AI-Enabled Health Solutions
    • EU Unveils Scaleup Europe Fund with €5 Billion Goal in 2023
    • September 14 Marks the Inaugural WTO Trade and Technology Day Emphasizing Inclusive AI Policies
    • Inflation in OECD Countries Eases to 4.2% in June 2026 Amid Declining Energy Prices
    • TONGWEI Secures Fourth Consecutive Fortune Global 500 Listing
    • Guatemala issues maximum alert status as Fuego volcano erupts on Monday
    • Home
    • Contact Us
    Giza Mail: Egypt’s news, delivered with context.Giza Mail: Egypt’s news, delivered with context.
    Wednesday, August 5
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • More
      • Sports
      • Technology
      • Travel
    Giza Mail: Egypt’s news, delivered with context.Giza Mail: Egypt’s news, delivered with context.
    Home»PR Newswire
    PR Newswire

    7.8 GWh Saudi Arabia ESS Project Officially Connected to the Grid

    December 18, 2025

    HEFEI, China, Dec. 18, 2025 /PRNewswire/ — The Kingdom of Saudi Arabia has officially completed grid connection of its landmark energy storage system (ESS) project with the nameplate capacity of 7.8GWh. Once fully energized, it will become the world’s largest operational battery energy storage system (BESS), marking a major milestone in the advancement of renewable energy in the Middle East.

    Sungrow Saudi Arabia 7.8 GWh Project

    The project spans three sites located in the southwestern regions of KSA, Najran, Khamis Mushait, and Madaya. Sungrow, the equipment provider, played a pivotal role by completing the manufacturing of over 1,500 PowerTitan 2.0 systems in just 58 days and delivering the entire project within a very challenging timeline.

    The PowerTitan 2.0 system features an all-in-one AC-DC block design, integrating embedded power conversion systems (PCS), pre-assembled battery container, medium voltage transformers and RMU, and comprehensive factory testing. This streamlined configuration significantly reduces onsite installation time. Additionally, Sungrow has deployed a dedicated local service team of professionals based in Saudi Arabia to support installation, commissioning, and grid connection.

    This 7.8 GWh project marks the beginning of large-scale energy storage deployment in the Middle East. The project’s annual charging and discharging capacity is expected to reach 2.2 billion kWh, which can meet the annual electricity needs of 400,000 households in Saudi Arabia.

    The project contributes significantly to Saudi Arabia’s Vision 2030 and supports the global transition toward clean and sustainable energy.

    About Sungrow

    Sungrow, a global leader in renewable energy technology, has pioneered sustainable power solutions for over 28 years. As of June 2025, Sungrow has installed 870 GW of power electronic converters worldwide. The Company is recognized as the world’s most bankable PV inverter and energy storage company (BloombergNEF). Its innovations power clean energy projects across the globe, supported by a network of 520 service outlets guaranteeing excellent customer experience. At Sungrow, we’re committed to bridging to a sustainable future through cutting-edge technology and unparalleled service. For more information, please visit: https://www.sungrowpower.com/en

    Logo

    Photo – https://mma.prnewswire.com/media/2848593/7_8.jpg
    Logo – https://mma.prnewswire.com/media/1344575/Logo.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/7-8-gwh-saudi-arabia-ess-project-officially-connected-to-the-grid-302645680.html

    Keep Reading

    Envision and Sasol Advance Future Energy Systems with Green Hydrogen Collaboration in South Africa

    Skye Africa Intelligence and ECSA-HC Sign Memorandum of Understanding to Scale AI-Enabled Health Solutions

    TONGWEI Secures Fourth Consecutive Fortune Global 500 Listing

    Sinopec Commissions 50,000-Ton Specialty PVA Facility, Creating World’s Largest Single-Site High-End PVA Production Base

    Wison Establishes Abu Dhabi Subsidiary and Opens New Office

    Boao Forum: CRRC Zhuzhou Institute Outlines Core Technologies and Application-Driven Innovation for Green Industry Growth

    Latest News

    July sees Eurozone manufacturing output reach highest level in 52 months despite sluggish demand

    August 5, 2026

    EU Unveils Scaleup Europe Fund with €5 Billion Goal in 2023

    August 5, 2026

    September 14 Marks the Inaugural WTO Trade and Technology Day Emphasizing Inclusive AI Policies

    August 5, 2026

    Inflation in OECD Countries Eases to 4.2% in June 2026 Amid Declining Energy Prices

    August 5, 2026

    Guatemala issues maximum alert status as Fuego volcano erupts on Monday

    August 5, 2026

    As of August 2023, Moderna Initiates Ebola Vaccine Phase 1 Trial Amid Ongoing DR Congo Outbreak

    August 5, 2026

    As of August 2, 2026, EU Implements AI Content Labeling Regulations Across Member States

    August 4, 2026

    UK Economy Shows Resilience in Early 2024 Despite Inflation and Labour Market Challenges

    August 4, 2026
    © 2026 Giza Mail | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.